Cottonwood Canyons Foundation
  • About Us
    • Mission Statement
    • Team
    • Careers at CCF
    • Board of Directors
    • Sponsors
    • Partners
    • Newsroom
    • FAQ
    • Contact Us
    • General Inquiry
    • Donation Inquiry
  • Stewardship
    • Trails Stewardship Program
    • Trails Stewardship Projects
    • Plants Stewardship Program
    • Public Weed Mitigation Guide
    • Watershed Protection
    • Adopt-A-Trail
  • Education
    • «  Online Education
      • For Individuals and Families
      • For Teachers/Homeschooling
    • Trails Online Resource Center
    • Trail Etiquette
    • Public Snowshoe Tours
    • Ski With a Ranger Tours
    • Kids’ Days
    • Wasatch Wildflower Festival
    • Silver Lake Visitor Center
    • Student Field Trips
    • Wildflowers Guidebook
  • Volunteer
    • Volunteering with CCF
    • Volunteer Sign-Up Form
    • Volunteer Login
  • Donate
    • DONATE ONLINE NOW
    • Individual Giving
    • Corporate Sponsorships
    • Adopt-A-Trail
    • Other Ways to Give
    • Sponsors
    • Deep Powder Passes
  • Events
    • Events Calendar
    • Wasatch Wildflower Festival
    • Public Tours and Field Trips
  • Click to open the search input field Click to open the search input field Search
  • Menu Menu
  • Link to Facebook
  • Link to Instagram
  • Link to X
  • Link to Mail
List List Menu
  • Projects Completed in 2023:

  • Climbing Access Projects
    • East Gate Buttress
    • Challenge Buttress
    • Jacob’s Ladder
  • Little Cottonwood Canyon
    • Alta Ski Area System Trails
    • Red Pine Lakes Trail
    • Little Cottonwood Creek Trail
  • Big Cottonwood Canyon
    • Lake Blanche
    • Bonneville Shoreline Trail (Ferguson to Dogwood)
    • Mill B North
  • Millcreek Canyon
    • Great Western Trail
    • Alexandre Basin – Bowman Connector
    • Desolation Trail from Thayne Canyon

2023 Trails Stewardship Projects

Climbing Access Projects

East Gate Buttress


This project focused on designing and establishing a sustainable approach to the East Gate climbing routes. The original trail was eroding, dangerously featured with loose rock, and unsustainably steep. With the technical assistance and guidance of the Access Fund’s Conservation Team, CCF rerouted the trail and installed switchbacks, rock retaining walls, and rock staircase features.

Metrics


2

Restored Staging Areas

6

New Switchbacks
(Including new corridor and retaining wall)

16

Staircases

30

Retaining Walls

90

Steps

160

Tons of Granite Moved and Set by Hand
(Approximately)

190

Feet of Old Trail Closed and Junked with Debris

300

Feet of New Tread

Photographs


Click/Tap on the photo(s) to enlarge (full-size)

Challenge Buttress


This project focused on reinforcing the existing climbing approach with sustainable, native rock features and creating soil retention structures under the climbing routes to serve as stable staging areas for climbers and belayers. We installed rock staircases, check steps and retaining walls at the climbing areas and on the approach.

Metrics


1

(Very large)
Tree Removed

3

Drains

8

Retained Belay
Pads

10

Staircases

27

Retaining Walls

50

Feet of Closed
Social Trail

55

Feet of New,
Rerouted Trail

126

Steps

780

Feet of Improved
Existing Trail

Photographs


Load more

Click/Tap on the photo(s) to enlarge (full-size)

Jacob’s Ladder


The CCF Trail Crew installed drainage and retention features with native rock structures to protect the trail’s upper switchbacks from erosion.

Metrics


1.5

Miles of Trail
Improved

4

Check Steps
Installed

5

Trees
Logged Out

8

Drains Installed

11

Retaining Walls
Built

12

Switchbacks
Reinforced

75

Feet Revegetated

80

Feet of Corridor
Cleared

340

Cubic Feet of Rock
Set into Structures

410

Feet of Tread
Rebuilt

Photographs


Click/Tap on the photo(s) to enlarge (full-size)

Little Cottonwood Canyon

Alta Ski Area System Trails


The CCF trail crew performed annual maintenance and scouting on nearly 75% of all available trails in the 12-mile Alta trail system while also participating in several stewardship events with the Alta Environmental Center (AEC). Maintained trails included Cecret Lake Trail, Devil’s Castle Loop, Snake Pit Trail, Albion Meadows Trail, and Catherine’s Pass Trail.

Metrics


5

Hazard Trees
Removed

7.8

Miles Maintained
and Scouted

14

Drains Built

35

Feet of Switchback Cuts
and Social Trails Closed

65

Drains Cleaned

100

Feet of Trail
Brushed

Photographs


Click/Tap on the photo(s) to enlarge (full-size)

Red Pine Lakes Trail


The primary work on this trail included cleaning drains, removing hazard trees, and closing and naturalizing old trail and switchback cuts.

Metrics


1/4

Mile of Social Trail and Switchback
Cuts Closed and Junked

3.4

Miles Scouted

8

Hazard Trees Removed

60

Drains Cleared

Little Cottonwood Creek Trail


The CCF Trail Crew focused on cleaning, maintaining, and building drains on this heavily used, easily accessible trail.

Metrics


2

Drains Installed

2.8

Miles Maintained

4

Trees Removed

19

Drains Cleaned

Big Cottonwood Canyon

Lake Blanche


Issues with drainage on this heavily used trail were addressed by the installation and repair of many of the trail’s upper section drainage features.

Metrics


2

Tons of Rock Set into
Structures (Approximately)

3.6

Miles of Trail Work
Scouted

7

Trees Logged Out

7

Drains Maintained

14

Drains Rebuilt

100

Feet of Closed and
Naturalized Social Trails

Photographs


Click/Tap on the photo(s) to enlarge (full-size)

Bonneville Shoreline Trail (Ferguson to Dogwood)


The CCF Trail Crew and SLRD Trails connected Ferguson Canyon Trailhead to Dogwood Picnic Area in Big Cottonwood with a new section of trail. Features included several switchbacks, drains, and retaining walls. Old scratch trail was widened and rehabilitated to reduce narrowing and vegetation growth. A stream crossing on the Ferguson side of the trail was retained with rock wall and a crush pad to raise the tread level and prevent trail wash outs in high flow.

Metrics


1

Stream Crossing

1.2

Miles of Trail Improved
and Heavily Maintained

4

Retaining Walls

5

Trees Cleared

16

Drains Installed

25

Tons of Rock Set into
Structures

250

Feet of Closed and Naturalized
Old/Social Trails

270

Feet of New Tread

1,800

Feet of Widened Tread

Photographs


Click/Tap on the photo(s) to enlarge (full-size)

Mill B North


The CCF trail crew repaired and reinforced a drainage crossing that had been destroyed in an avalanche two winters before. The features constructed included a retained pad of porous crushed rock with stepping stones, a multi-tiered staircase, and a stretch of retained tread.

Metrics


5

Retaining Walls

14

Steps

3

Stepping Stones

75

Feet of New Tread

100

Square Feeet
Crush Pad

27,000

Lbs. of rock used
(13.5 tons)

Photographs


Click/Tap on the photo(s) to enlarge (full-size)

Millcreek Canyon

Great Western Trail


An 850ft reroute to remove the old trail from the stream bottom and create a sustainable alternative for multi-use. Features installed included drains, wood retaining walls, and a rock-reinforced stream crossing. Several hazard trees were removed and the old trail was revegetated with grass from the new corridor.

Metrics


1

Stream Crossing:
24 ft2
of crush pad
20 ft3 retaining rock and log wall

2

Retaining Features
Installed

4

Hazard Trees
Removed

7

New Drains
Installed

530

Feet of Closed and
Naturalized Old Trail

850

Feet of New Tread
(0.16 mi)

Photographs


Click/Tap on the photo(s) to enlarge (full-size)

Alexandre Basin – Bowman Connector


Extremely narrowed or eroded tread was repaired on the 1.5-mile stretch connecting trail between Alexander Basin and Bowman Fork trails to widen and reestablish the trail bench uphill and to mitigate sloughing.

Metrics


1.5

Miles Maintained

15

Trees Cut and Cleared

150

Feet of New Tread

Photographs


Click/Tap on the photo(s) to enlarge (full-size)

Desolation Trail from Thayne Canyon


In several places the tread on this trail has become thin or heavily eroded downhill. The CCF crew targeted the most severely damaged sections of the trail and reestablished a wider trail uphill, often rerouting small sections of the trail onto a higher bench.

Metrics


2

Retaining Walls

3.8

Miles Scouted

5

Hazard Trees Cleared
from the Trail

50

Feet of Closed
and Naturalized Tread

68

Cubic Feet
of rock used

210

Feet of Newly
Repaired Tread

Photographs


Click/Tap on the photo(s) to enlarge (full-size)

For more information, please contact us directly using this form

Email Director

Share this page

  • Share on Facebook
  • Share on X
  • Share on Pinterest
  • Share on LinkedIn
  • Share on Tumblr
  • Share on Reddit
  • Share by Mail
  • Trails Stewardship Program
  • Trails Stewardship Projects
  • Plants Stewardship Program
  • Public Weed Mitigation Guide
  • Watershed Protection
  • Adopt-A-Trail
  • Frequently Asked Questions

Join our newsletter

Please enable JavaScript in your browser to complete this form.
Name *
Loading
Volunteer Login
Please enable JavaScript in your browser to complete this form.
Can’t remember your password? Click here to reset.

Follow us on Facebook

12.5k+ likes
Logo image
Open CCF Facebook page now
Join our Facebook community!

INSTAGRAM

CCF is honored to be named a recipient of the 2025 CCF is honored to be named a recipient of the 2025 AllTrails Stewards Fund. Please read more about our project, and the other awardees at http://www.alltrails.com/press/announcing-the-recipients-of-the-2025-alltrails-stewards-fund

Thank you @alltrails for providing our community with detailed trail reviews. We are proud of our partnership in providing current trail information!
Follow CCF on Instagram

Join our newsletter

Please enable JavaScript in your browser to complete this form.
Name *
Loading

Looking for something?

Search Search
© Copyright - Cottonwood Canyons Foundation - 2025 - All Rights Reserved
  • Home
  • Privacy Policy & Legal Notes
Scroll to top Scroll to top Scroll to top